Where necessary, the following documents have to be enclosed with the notification in quadruplicate:
- Information about the suitability of the intended site
- Information about the type, purpose, scope and duration of the project
- Land register identification of the property affected by the treatment facilities, indicating the name of the owner and enclosing an extract from the land register (not older than six weeks)
- If the applicant is not himself/herself the owner: In addition, the written consent of the property owner on whose property the treatment facilities are to be established
- Indication of the name of the owner of any lawfully practised water utilisation
- Description of the operation (including information about the types of waste to be treated, treatment methods, and a list of the machinery and of any other equipment of the facilities)
- A presentation of the facility's energy efficiency if it is a facility for incineration or co-incineration with energy recovery
- Construction specifications with the necessary designs and drawings
- Waste management plan
- Description of the anticipated emissions from the treatment facilities and information about the prevention or, if this is not possible, the reduction of emissions
- Description of the precautions for compliance with the treatment obligations according to the Abfallwirtschaftsgesetz (AWG)
A notification about a closure or cessation shall be accompanied by an assessment and, if necessary a presentation of the measures.
A notification about other changes which do not adversely affect the emission behaviour of the installation shall be accompanied by a substantiated statement that the emission performance of the treatment facility will not be adversely affected.
In case of a notification of a landfill project, where necessary, the following additional documents have to be attached in quadruplicate:
- Information about the hydrological, geological and water management characteristics of the site
- Information about the (sub-)type of landfill and the planned total volume
- Operating and monitoring plan (including a description of the measures planned to protect the environment, in particular air and water bodies, indicating the planned measuring methods, information about the technical landfill requirements and the safety engineering measures)
- Information about measures to prevent incidents and to control their consequences for man and the environment
- Information about the measures planned for the case of abandonment of the landfill operation (preliminary abandonment plan) and the follow-up measures, in particular a monitoring plan
- Information about the type and scope of surety
- Presentation of cost coverage for
- construction,
- the estimated costs of operation,
- abandonment and
- follow-up in the amount to be charged for the dumping of all wastes on the landfill.